Botanic Garden Bank Stabilization
Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum 1_04.23.2025 | 2.6 MB |
Addendum 2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum 2_04.30.2025 | 858.3 KB |
