Botanic Garden Bank Stabilization
Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Status
Bidding Closed
| Prebid Date | 4/15/25 11:30am |
| Bid Date | 5/7/25 2:00pm |
Location
The Project is located at 1550 Wildcat Canyon Road Berkeley, CA 94708
Estimated Cost. The estimated construction cost is $230,000.
A bidders’ conference will be held on April 15, 2025, at 11:00 AM, at the following location: Regional Parks Botanic Garden, Tilden Regional Park – 1550 Wildcat Canyon Road Berkeley, CA 94708 to acquaint all prospective bidders with the Contract Documents and the Worksite. The bidders’ conference is mandatory. A bidder who fails to attend a mandatory bidders’ conference will be disqualified from bidding.