San Francisco Bay Trail at Point Molate
Project Description: Grading/earthwork; construction of 2.3-mile segment of San Francisco Bay Trail, construction of shoreline revetment, beach access trail, and installation of two prefabricated wooden boardwalk structures.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum No. 1 | 1.6 MB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
Addendum No 2 | 1.0 MB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
Davis-Bacon Determination - CA20250018 | 477.1 KB |
Addendum 4
(click to expand/collapse)

Name | Size | |||
Addendum No 4 | 361.8 KB |