Contra Loma Fishing Docks Replacement Project

Replace, remove and dispose of two (2) existing floating timber fishing docks and gangways with two (2) new aluminum docks and with gangway access; remove six (6) existing timber piles, install one (1) new access platform with two (2) new steel support piles, and two (2) concrete deadman anchors at North Dock; remove and replace timber steps at the North Dock; remove timber cribbing beneath gangway at South Dock; work includes all incidentals and appurtenant items as shown on the plans and specified herein.
  Addendum 1 (click to expand/collapse)