Improve Peralta Oaks North Project

Remodel an existing 4-level office building consisting of four levels of office/administration and parking. The existing building is owned by the District and the renovation will create a new state of the art LEED Gold certified facility serving the District’s various emergency operations and life safety operations. The total square footage (SF) of the existing building and renovation is 99,170 SF.

Status

Accepting Bids

Prebid Date5/7/24 10:00am

Bid Date5/30/24 2:00pm

Company & Contacts

East Bay Regional Park District
Toby Perry  

Location

EBRPD

Engineer’s estimate: $81,000,000

A mandatory bidders’ conference will be held on Tuesday May 7, 2024, at 10 AM, at the following location: 2955 Peralta Oaks Court, Oakland, CA 94605 to acquaint all prospective bidders with the Contract Documents and the Worksite. A bidder who fails to attend a mandatory bidders’ conference may be disqualified from bidding.

Bid Submission. The District will accept bids for its IMPROVE PERALTA OAKS NORTH PROJECT (“Project”), by or before May 28, 2024, at 2 PM, via electronic submission by uploading them electronically to the Park the District’s planroom via the “Submit Bid Docs” tab on the Improve Peralta Oaks North page. Bids will be publicly opened at the date and time listed above via online Zoom meeting at the link below:

Improve Peralta Oaks North Bid Opening

Zoom Meeting Link : https://ebparks.zoom.us/j/86725900075

Meeting ID: 867 2590 0075